MOB.LIGNE9.INFO

Revue et suivi de la mobilisation contre la ligne 9 d'Enbridge

Page 3 of 4

Line 9 protesters blockade Enbridge site in North York

blockadeNorthYork

Via Metro News :

A group of around a dozen protesters have blockaded an Enbridge construction site near Dufferin St. and Finch Ave. W., in opposition to plans to reverse and boost the flow of the Line 9 pipeline.

The protest Monday comes in solidarity with a group of protesters at an Enbridge site near Woodstock, where five were arrested Sunday night.

Though Monday’s protest had already been in the works, Sunday’s arrests added “fire” to their efforts, according to media representative Umair Muhammad.

Muhammad and the dozen or so protesters represent a group of Toronto residents involved in the movement against Line 9, who call themselves Citizens Response Unit for Decontaminating our Environment (CRUDE).

Continue reading

#Dam Line 9

damlinenine04

Le 5 août 2014, des gens des communautés du sud-ouest de l’Ontario affectées par le projet d’inversion de la ligne 9B d’Enbridge, se sont installé-e-s sur un site de travaux sur le tracé du pipeline. Ils et elles y sont resté-e-s pendant 6 jours, bloquant l’avancement du projet.

Couverture en français :

Beaucoup plus d’information (en anglais) sur damline9.tumblr.com

Blockade of Enbridge Work Site on Line 9 Route

Video by Janice Lee.

Via Alternatives Journal :

Concerned individuals from Six Nations, Waterloo Region and other nearby communities have shut down an “integrity dig” on Enbridge’s Line 9 pipeline in North Dumfries, Ontario this morning. Protestors are asserting that Enbridge is operating on Haudenosaunee territory without the required consent or consultation, according to a press release. Workers left the site without incident and at least some equipment has been removed. (… read more here)

More coverage :

Rising Tide Shuts Down Line 9 Test Site in Toronto

Photo: Murray Bush - Flux Photo

Photo: Murray Bush – Flux Photo

Via Vancouver Media Co-op :

TORONTO – Members of Rising Tide blocked the site of an Enbridge Line 9 Pipeline  “integrity dig” today. The move prevented Enbridge from carrying out cursory tests aimed at permission to reverse the flow of the nearly 40-year-old line.

Continue reading

NO INTEGRITY, NO DIGS : Blocage d’un site d’excavation sur la ligne 9B

nointegrity01

Des personnes habitant en territoire traditionnel Mississauga (Burlington, Ontario) ont bloqué pendant 12 heures le chemin d’accès d’un site d’excavation sur la ligne 9B.

Plus d’information (en anglais) sur Mediacoop.ca

Marche des Peuples pour la Terre Mère

marchedespeuples01

Via la page Facebook Marche des Peuples pour la Terre Mère :

Du 10 mai au 14 juin 2014, des citoyens et des citoyennes se rassembleront pour marcher en moyenne 20 km par jour pendant 34 jours. Ils et elles suivront le tracé des projets de pipelines de TransCanada (Énergie Est) et d’Enbridge (inversion de la ligne 9). L’objectif de la marche est de sensibiliser et de renforcer la mobilisation citoyenne contre l’arrivée des oléoducs, de sables bitumineux et les projets d’exploitation des hydrocarbures au Québec. Les marcheurs et les marcheuses s’arrêteront chaque soir pour rencontrer les communautés par le biais de spectacles engagés et de discussions sur ces enjeux qui nous touchent toutes et tous directement.

Partant de Cacouna, où TransCanada projette d’implanter un port pétrolier, et finissant à Kanehsatà:ke, en territoire Mohawk, la marche des Peuples pour la Terre Mère s’inscrit dans une volonté d’unir notre voix à celle des Premières Nations. Ensemble, défendons notre droit fondamental de vivre et d’élever nos enfants dans un environnement sain.

marchedespeuples_logo

Occupation of Eastern Montreal Chamber of Commerce against Line 9

Via Antidéveloppement :

PRESS COMMUNIQUÉ – Montréal, March 19, 2014 – occupation of the office of the Chambre de commerce de l’Est de Montréal

As part of the day of action against Line 9, an anti-capitalist and anti-colonial demonstration occupied the office of the Chambre de commerce de l’Est de Montréal (CCEM, or « East Montréal Chamber of Commerce » in English). We call for people to participate in this day of action at the moment and in the way that you feel to be the most appropriate, in making a radical break with these patriarchal, colonial, capitalist societies! Today and everyday!

During the October 2013 hearings of the National Energy Board (NEB), the CCEM pronounced itself, in the name of its 1200 members, to be in favour of the reversal of Line 9. Because it speaks of job creation, because it speaks of the maintenance of the « industrial input », which depends upon a constant input of oil at any cost, the CCEM could participate in these hearings as a good representative of the business community. That’s the kind of interlocutor that Enbridge is looking for: « credible » and « rational ».

Continue reading

Justice Climatique Montréal épelle « Justice Climatique Pour Tous » pour protester contre la récente approbation du renversement de l’oléoduc de la ligne 9

Crédit photo : Adam Franc

Crédit photo : Adam Franc

Via Montreal Media Coop :

Date : Mercredi le 12 mars, 2014

Justice Climatique Montréal éppelle « Justice Climatique Pour Tous » pour protester contre la récente approbation du renversement de l’oléoduc de la ligne 9

Montréal, Québec : Justice Climatique Montréal affichera un message illuminé ce soir à 9hres pm au coin de Cathédrale et de la Gauchetière Ouest près du centre Bell.  Il y a une semaine, l’Office National de l’Énergie (ONÉ) approuvait le renversement controversé de l’oléoduc de la Ligne 9, signalant l’arrivée des sables bitumineux au Québec. Justice Climatique Montréal en appelle à la résistance au développement des sables bitumineux et pour qu’un virage soit opéré en faveur d’un futur énergétique qui ne nuit pas au bien-être des communautés et écosystèmes.
Continue reading

Line 9: Not Worth the Risk! Report Launch

PDF document of the full Report

 

Press release from Waterloo Region Against Line 9 :

Line 9: Not Worth the Risk! Report Launch
New report reveals litany of threats posed by Enbridge’s aging pipeline

Friday February 21st, 1:00pm – Region of Waterloo building, 150 Frederick St., Kitchener

As the Line 9 tarsands pipeline reversal decision looms, intervenors in the National Energy Board process have prepared a comprehensive report detailing the many treaty violations, significant social and economic risks, as well as environmental hazards related to Enbridge’s proposal.

Report contributor Sakura Saunders of Rising Tide Toronto remarks, “As intervenors, we were shocked by the information we learned during the NEB hearings. We compiled this report to alert the public that even according to Enbridge’s own data, this pipeline is in no condition to transport such dangerous materials as tar sands bitumen and fracked oil.”

Continue reading

Toronto activists lock down to equipment at Enbridge Line 9 river crossing

Photo: Joel Eastwood (Twitter)

Photo: Joel Eastwood (Twitter)

Press release (via Two Row Times) :

FOR IMMEDIATE RELEASE
fb.com/RisingTideToronto @RisingTideTor #LockDownLine9 December 3, 2013

(Toronto, ON) Members of Rising Tide Toronto have locked down to equipment at an Enbridge Line 9 river crossing, effectively halting construction. This construction is taking place before the NEB has approved this pipeline reversal project.

This action, taking place on Mississauga New Credit territory, was done in solidarity with Indigenous sovereigntist and environmental justice struggles across Turtle Island. All First Nations Band Councils who participated in the hearings urged the reversal not be granted. Amidst outstanding land claims, there has been absolutely no consultation with any Indigenous communities along the route of Line 9.

Continue reading

« Older posts Newer posts »

© 2019 MOB.LIGNE9.INFO

Theme by Anders NorenUp ↑